Construction Defect
Representative Case Summaries
- Plaintiff and a subcontractor entered into a Short Form Subcontract Agreement under which the subcontractor agreed to perform and furnish the labor, services, materials, and equipment necessary to complete the below-grade waterproofing of the basement at plaintiff’s home. Plaintiff alleges he discovered four leaks in the basement at the theatre room, powder room, and guest bathroom and immediately notified the subcontractor, which thereafter returned to the property and performed injections to the inside of the basement walls in an attempt to stop the leaks. The injections did not remedy the situation. In the following month, additional water leaks occurred. But the subcontractor’s eventual response was the leaks were coming from a plumbing line, not from the failure of the below-grade waterproofing it had installed. Plaintiff then hired a leak detection company, which tested for leaks in the domestic and irrigation system throughout the property, water piping systems, and incoming and outgoing waste lines at the basement sump pit. No leaks were detected. The leak detection company concluded the infiltration of water into the basement was not from a plumbing system, but rather from groundwater. Plaintiff filed the instant action for breach of contract and negligence.
- Plaintiff undertook a design and renovation job concerning defendant’s condominium unit subject to a design and construction contract, which plaintiff alleged defendant breached. Plaintiff asserted causes of action for fraud, defamation, and conversion as well. Defendant cross-complained against plaintiff and others, asserting claims for disgorgement, breach of contract, negligence, and fraud while alleging plaintiff lacked a contractor’s license and mismanaged the renovation and reconstruction of the unit.
- This multi-party, construction defect action arose out of a residential construction and renovation project performed at real property owned by plaintiffs who allege they entered into a design build arrangement with defendant, who undertook responsibility for the design, coordination, and construction of the project. Defendant retained numerous subcontractors and tradesmen to perform discrete scopes of work, including but not limited to plastering, flooring, plumbing, electrical, painting, roofing, drywall, and finish work. Plaintiffs further allege the project was not timely completed and various aspects of the work were defective, non compliant with applicable standards, and improperly designed or constructed, resulting in property damage, economic loss, loss of use, and the need for investigation, repair, and remediation. Plaintiffs also allege defendant was not properly licensed during a portion of the project and some of the subcontractors were also not properly licensed. Defendants denied all allegations, asserted affirmative defenses, and some filed cross-complaints against the involved subcontractors.
- This construction defect action arose from two separate construction projects occurring in 2009 and in 2015 at a high-end single-family residence. Beginning in 2009, two defendants constructed and performed other improvements at the subject property, which included construction of a second story addition and remodel of the existing first level. In 2015, the home was purchased by a real estate investor, who then hired two other defendants to convert an exterior deck into a walk-in closet for the master bedroom. Others were hired to do roofing work and lath and plaster work for the closet project, both of which were former parties in this case. Between 2016 and 2020, plaintiff rented the subject property and discovered water intrusion in and around the area of the closet project. After discovering water intrusion in more areas than just the area of the closet project, plaintiff contracted with various parties to repair the conditions. But the water intrusion was not remedied.
- HOA entered into contract with defendant, a roofing company, to improve the property by performing roofing, decking, waterproofing, and related services. Plaintiff alleges the work was defective and, instead of addressing the defects, defendant abandoned the project.